Shuttle Atlantis (STS-125) Inside the Vehicle Assembly Building Latest Photos(09/03/2008) --- CAPE CANAVERAL, Fla. – Space shuttle Atlantis stands ready in the Vehicle Assembly Building at NASA’s Kennedy Space Center for the pending rollout to Launch Pad 39A. Visible behind Atlantis (upper left) is the external fuel tank. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Managers are closely following Hanna to determine when would be the best time this week to move space shuttle Atlantis to its launch pad. The tentative rollout time is 10 a.m. Sept. 4, depending on the track Hanna follows along the Florida coast. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8.
Photo credit: NASA/Jack Pfaller
(08/23/2008) --- CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis approaches the floor of the mobile launcher platform in high bay 3. Behind the shuttle are the external fuel tank and twin solid rocket boosters already stacked there. Atlantis will be mated to the tank and boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8. Photo credit:
NASA/Dimitri Gerondidakis
Spaceboosters Online Store for NASA Patches,Pins,Photos and more.........